📍Recent Project Spotlight

This RT resin floor (in bold red) was laid by our team at KELRAY LTD, complete with stainless steel ACO drain installation and full hygiene panelling throughout the space.

The floor was primed beforehand to ensure a durable, long-lasting finish and completed over three days collectively.

Other works on-site included:

✔️ Hygiene box and doorway install
✔️ Wall protection white rock UPVC cladding to all sides
✔️ Ceiling painting
✔️ Hygiene panelling along the right-hand side

High standards. Tight timelines. Delivered with care.