Hygienic Environment Factory

KELRAY was contracted by the owner of a unit who was looking to expand his research facility. The building was an empty unit and it had to be completely fitted out to create a scientific research facility to include offices, kitchen, toilets and designated areas, each identifiable as a zone with the use of colours. The aim was to create a hygienic environment for fish research.

Objectives and Challenges:

The project involved creating a hygienic environment for fish research. This meant that the flooring, walls, and doors needed to be specially designed and installed to ensure that they met the required hygiene standards. Additionally, a new drainage system needed to be installed, and the flooring needed to be non-slip.

Project Description

KELRAY began the project by installing a complete new drainage system and laying polymer screeds to falls to new drainage. Next, the team prepared, primed, and laid polyurethane non-slip industrial flooring, which was specifically designed for use in a hygienic environment.

To create the hygienic environment, KELRAY installed hygienic panelling and hygienic doors to form rooms. Full electrical supplies were provided to the offices and production areas, along with an alarm system and lighting system.

In the offices, stud partition offices were formed with plasterboard and plaster skim including ceilings. New timber door sets and skirtings were installed throughout, along with carpet tiles to office areas. A new kitchen was supplied and fitted, and full decoration was completed in the offices.

Noteworthy Aspects

The project was for the creation of a hygienic environment for fish research. KELRAY overcame the challenges of designing and installing hygienic flooring, walls, and doors. Additionally, a new drainage system was installed, and full electrical supplies were provided.

Final Outcome

  • The project was completed on schedule, meeting the client's needs and requirements.
  • The facility was fully equipped with a hygienic environment for fish research.
  • The flooring, walls, and doors met the required hygiene standards, ensuring a safe environment for fish research.
  • The office areas were fully fitted out and decorated, providing a functional and comfortable workspace for staff.